Project details
- water treatment installation
- stainless steel 316L pool bridge
- salt electrolysis system
Completion
This project is renovated in 2021.
Previous
Next
A swimming pool up to 10 metres higher than the technical room
In the technical room, which was recently renovated (2021), we installed, among other things, a water treatment installation. The remarkable feature of this project is that the swimming pool is more than 10 metres higher than the technical room!
Swimming pool bridge
In addition to the water treatment installation, we developed a tailor-made bridge a while ago. Due to this bridge, guests can move across the swimming pool from one area to another.