Renovation of technical room indoor swimming pool

Recently (2021) the technical room of the Steigenberger Airport Hotel was renovated. We replaced the entire water treatment installation. Due to the proportional control of the salt electrolysis, fluctuations in the chlorine value are kept to a minimum.
A swimming pool up to 10 metres higher than the technical room

In the technical room, which was recently renovated (2021), we installed, among other things, a water treatment installation. The remarkable feature of this project is that the swimming pool is more than 10 metres higher than the technical room!

Swimming pool bridge

In addition to the water treatment installation, we developed a tailor-made bridge a while ago. Due to this bridge, guests can move across the swimming pool from one area to another.

Salt electrolysis

Due to our salt electrolysis with proportional regulation, the chlorine production of the Steigenberger Airport Hotel is automatically adjusted to the needs of the water, reducing fluctuations in the chlorine value to a minimum. Chlorine is produced on site from kitchen salt only. Therefore no chemicals need to be transported and/or stored.

Do you like this article?

Share article on Facebook
Share article on Linkedin
Share article on WhatsApp