Medical

RESIDENTIAL

CommerCIAL

Tieleman_Wit_ENPOOL TECHNOLOGY

Tieleman - Over 50 years of experience

Thanks to the movable floors and bulkheads of Tieleman Pool Technology medical institutions, residential clients, Olympic facilities, public pools and hotels are able to use their pools multifunctionally throughout the day. This ensures an efficient and varied daily program, where the swimming depth can be adjusted according to the swimmer’s needs. Projects are carried out from start to finish by Tieleman to guarantee the best possible result in every situation.

Discover our projects

NO Oksnesbadet Movable floor with hinged wall public pool 06 1 - tieleman zwembadtechniek

Øksnesbadet | Norway

The public Aquatic Facility in the Norwegian place Øksnes will feature a 25.00 x 5.00 m movable floor with a hinged bulkhead and a platform lift for wheelchair-users. Furthermore this pool will feature two different temperature zones. More on this project will follow soon.

Commercieel Steigenberger waterbehandeling en elektrolyse 02 - tieleman zwembadtechniek

Steigenberger Airport Hotel | Amsterdam | The Netherlands

Recently (2021) the technical room of the Steigenberger Airport Hotel was renovated. We replaced the entire water treatment installation. Thanks to the proportional control of the salt electrolysis, fluctuations in the chlorine value are kept to a minimum.

Tieleman