Our construction process
COMMITMENT AND QUALITY
The construction process of a movable floor or another customized pool solution could be overwhelming if you don’t know what to expect. That’s why we at Tieleman Pool Technology ensure that you will be informed through every step of the process. In addition we will personally ensure that each stage is completed according to the highest standards.
OUR CONSTRUCTION PROCESS IN 7 STEPS
Prior to the construction process, you will have an orientation meeting with our project manager to see what the options are for your medical, residential or commercial pool.
After reaching an agreement with the client as to which product and associated options fall within the project scope, it is important that Tieleman is provided with the required construction drawings. These construction drawings are thoroughly analyzed, so Tieleman is able to design a detailed 3-D design.
You will receive a 3-D computer generated design before the production starts. This realistic render allows you to see all the elements of the pool design. At this stage, you can still make modifications and improvements with the architect or contractor. Once the design is approved, strength calculations and technical drawings are made.
Once the 3-D design and technical drawings have been approved, the production starts. Components such as movable floors, stainless steel pools and pool lifts each require specific knowledge and expertise. At Tieleman, all these components are produced in-house and tested by our own well trained experts.
After the production is completed, our experts start the on-site installation. On the construction site, Tieleman works together with the (local) pool builder and other third parties involved. On site, it is important that there is proper access to all facilities related to the pool.
During the completion, a Tieleman expert will check along with you that the installation is working properly and safely. You will then receive manuals and instructions on the proper use of the installation, after which the project is finally completed and the pool is ready for use.
In case of any malfunctions, you can contact the Tieleman office where you will be immediately connected to a service technician. If the malfunction cannot be solved over the phone, Tieleman will ensure that a service technician is on site as soon as possible.
Tieleman pool technology from start to finish
Tieleman relies on over 50 years of research and development with some of the most renowned rehabilitation centres and hospitals to design and build their hydrotherapy-related products. All manufactured products meet and exceed the needs in any medical application.
Curious about the possibilities?
Feel free to contact us!
Discover our projects
Øksnesbadet | Norway
The public swimming pool Øksnesbadet in the Norwegian town of Myre was equipped by Tieleman with a movable floor (25.00 x 5.00 m) with a hinged wall and a platform lift for wheelchair-users. These solutions allow the public swimming pool to be used for various activities ranging from competitive swimming to aqua jogging.
Corendon Village Hotel | Badhoevedorp | The Netherlands
The indoor swimming pool of the Corendon Village Hotel in Badhoevedorp was equipped by us with a fully automated water treatment installation and a salt electrolysis with proportional control.
Grand Hotel Amrath | Amsterdam | The Netherlands
We have provided the Grand Hotel Amrath with tailor-made engraved pool stairs and a water treatment installation. To guarantee the feeling of ultimate relaxation, we have also installed several jet streams.